Monolithic EcoShells vs. Conventional Concrete Buildings
Here is a chart that compares the construction requirements of either an EcoShell I or an EcoShell II to that of a conventional concrete structure. Please note: conventional buildings require 200% to 300% more concrete, 300% to 400% more reinforcing bar and double the labor. But ironically, it’s the EcoShell that has the strength to withstand natural disasters.
Type | Size | Floor Area | Interior Volume | Surface Area | Concrete Needed | Rebar Needed |
Dome | 20’d x 11’h | 314 sq. ft. | 2,408 cu. ft. | 690 sq. ft. | 8 cu. yd. | 1,250 lbs. |
Square | 18′ × 18′ × 8′ | 324 sq. ft. | 2,592 cu. ft. | 900 sq. ft. | 22.7 cu. yd. | 4,900 lbs. |
Difference | -10 sq. ft. | -182 cu. ft. | -210 sq. ft. | -14.7 cu. yd. | -3,250 lbs. |
Dome | 30’d x 13’h | 707 sq. ft. | 5,744 cu. ft. | 1,238 sq. ft. | 24.1 cu. yd. | 2,500 lbs. |
Square | 24′×30′×8′ | 720 sq. ft. | 5,760 cu. ft. | 1,584 sq. ft. | 42.7 cu. yd. | 9,200 lbs. |
Difference | -13 sq. ft. | -16 cu. ft. | -346 sq. ft. | -18.6 cu. yd. | -6,700 lbs. |
Dome | 40’d x 16’h | 1,257 sq. ft. | 12,197 cu. ft. | 2,060 sq. ft. | 30 cu. yd. | 4,200 lbs. |
Square | 24′×52′×18′ | 1,248 sq. ft. | 9,984 cu. ft. | 2,464 sq. ft. | 68.8 cu. yd. | 13,300 lbs. |
Difference | 9 sq. ft. | 2,213 cu. ft. | -404 sq. ft. | -38.8 cu. yd. | -9,100 lbs. |