![Step 7 — Place the rebar following the engineering specifications. Care should be taken to keep rebar as tight as possible to the shell concrete. The plan is to have 3/4" of concrete on the exterior of the rebar. Number three (3/8”) rebar spaced 10 inches on center both ways is always safe for small domes.](/vault/img/2011/05/10/4dc92b8cc29e068473000bc9/medium/7ecoshell2.jpg)
Step 7 — Place the rebar following the engineering specifications. Care should be taken to keep rebar as tight as possible to the shell concrete. The plan is to have 3/4" of concrete on the exterior of the rebar. Number three (3/8”) rebar spaced 10 inches on center both ways is always safe for small domes.